Obvious steps towards the final product:
- Research
- Planning
- Production
- Editing
- Revision
- CCR
The way I'd break these steps down makes more time than usual for finding costumes and editing. This is because I need to research and find out how to accurately dress my character and edit the whimsical, clueless, innocent moment the m.c. is having.
Week one (2/9 - 2/15)
- Research
- Costume design
- Music
- Begin setting up
- Storyboard
- Find actress or somebody to film
Week two (2/16 - 2/22)
- End setting up
- Thrift/purchase costume
- Find park to film in
- Schedule filming
- Practice hair design
- Script
- Find music
City Parks | City of Weston, FL. (2024). Westonfl.org. https://www.westonfl.org/government/parks-and-recreation/city-parks
Week three (2/23 - 3/1)
- Production
- Filming
- Begin (and possibly end) foley
- Begin voice over if decided on
- Editing
- View next week plans
Week four (3/2 - 3/8)
- Editing
- Line up shots to music cues
- Line up foley
- Line up voice over if decided on
- Visual editing (adjust lighting)
Week five (3/9 - 3/15)
- Revision
- Double-triple-check timing, editing gaps, foley overlaps, and length
- Plan a mock analysis on my own opening
- Revise missing items
Week six (3/16 - 3/22)
- CCR
- Plan a smaller research chart on my own opening
- Write reflection
- Compare to examples to edit and improve
Week seven (3/23 - 3/29)
- Free time in case there are challenges or delays along the way